Modernise the legacy system — without betting the business on a rewrite.

Big-bang rewrites are famous for running late, missing hidden business rules and ending up with two systems to maintain. We modernise incrementally: capture what the old system really does, wrap it, replace it piece by piece and switch traffic over only when each piece is proven.

Understand

Map · characterisation tests

2

Wrap

Routing layer · APIs

1.5

Replace piece by piece

One capability at a time

5

Migrate data

Reconcile · rollback plan

3

Retire legacy

Switch off with confidence

1
059 stages

Rewrite, refactor, re-platform or replace?

OptionWhen it fitsRisk
Re-host / re-platformInfrastructure is the problem (end-of-life servers, data centre exit)Low — behaviour stays the same
Refactor in placeCode is maintainable enough; specific modules hurtLow to medium
Incremental replacement (strangler fig)Architecture blocks the business, but the system must keep runningMedium — controlled step by step
Replace with off-the-shelfThe capability isn’t a differentiator (e.g. generic HR, accounting)Medium — migration and process change
Big-bang rewriteRarely justified: small systems with well-understood behaviourHigh

Our approach

  1. 1

    Map what exists

    Modules, integrations, data flows, batch jobs, reports — and the undocumented business rules hiding in stored procedures and spreadsheets.

  2. 2

    Pin down behaviour

    Characterisation tests capture current outputs for real inputs, so the new implementation can be proven equivalent (or deliberately different).

  3. 3

    Introduce a seam

    An API or routing layer in front of the legacy system lets new components take over capabilities one at a time.

  4. 4

    Replace and shadow

    New components can run in parallel, compared against the legacy output, before traffic switches over.

  5. 5

    Migrate data carefully

    Incremental migration with reconciliation reports and a rollback plan for each step.

Frequently asked questions

Want a second opinion on your project?

Tell us what you’re building and where you’re stuck. We’ll reply within one business day with the most practical next step — even if that step isn’t us.